必胜高考网 > 外语类 > 英语六级 > 阅读理解 >

大学英语六级阅读理解专题训练

时间: 世芳2 阅读理解

  大学英语六级阅读理解专题训练练习一

  56. What is traditional educators’interpretation of the research outcome mentioned in the first paragraph?A) Students are notable to apply prior knowledge to new problems.B) College studentsare no better than fifth grader in memorizing facts.C) Education has notpaid enough attention to major environmental issues.D) Education hasfailed to lead students to think about major scientific ideas.

  57. In what way are college studentsdifferent from children?A) They have learned to thinkcritically.B) They are concerned about socialissues.C) They are curious about specificfeatures.D) They have learned to workindependently.

  58. What is the benefit of askingquestions with no ready answers?A) It arousesstudents’ interest in things around them.B) It cultivatesstudents’ ability to make scientific inquiries.C) It trains students’ability to design scientific experiments.D) It helps studentsrealize not every question has an answer.

  59. What is said to be the advantageof informal learning?A) It allows forfailures.B) It charges notuition.C) It isentertaining.D) It meetspractical needs.

  60. What does the author seem toencourage educators to do at the end of the passage?A) Train students tothink about global issues.B) Design moreinteractive classroom activities.C) Make full use ofinformal learning resources.D) Includecollaborative inquiry in the curriculum

  大学英语六级阅读理解专题训练答案一

  56.D

  57.A

  58.B

  59.A

  60.C

  大学英语六级阅读理解专题训练:练习二

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  大学英语六级阅读理解专题训练:答案二

  1. A

  2. C

  3. B

  4. D

  5. A